Русские видео

Сейчас в тренде

Иностранные видео


Скачать с ютуб Dasu Hydropower Project | Technical Details & Construction | 3D Animation в хорошем качестве

Dasu Hydropower Project | Technical Details & Construction | 3D Animation 4 года назад


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



Dasu Hydropower Project | Technical Details & Construction | 3D Animation

#DASUHPP #Dam #Hydropower The Dasu hydropower project (DHP) includes the construction of a 4,320MW hydropower plant on the Indus River near Dasu town in Kohistan District of Khyber Pakhtunkhwa (KPK) province, Pakistan. The project is located approximately 74km downstream of the Diamer Basha Dam, 240km upstream of the Tarbela Dam, and 345km from Islamabad. The run-of-the-river hydropower project is being developed in two stages by Pakistan’s Water and Power Development Authority (WAPDA). It is part of the hydropower development projects included in the Vision 2025 Program envisaged by WAPDA in 2001 and the Power Policy 2013 of the Government of Pakistan (GOP). A total of 12 hydropower units rated at 360MW each will be installed, which includes six in the first phase and six in the second. Phase one will have an annual output capacity of 12,300GWh, while phase two completion would increase the same to 21,700GWh. The first phase primarily involves the construction of a roller-compacted concrete (RCC) gravity dam with ancillary structures and an underground powerhouse, installation of six turbo generators, and a double-circuit 500kV transmission line. The second phase will involve the construction of another underground powerhouse with ancillary structures and installation of the remaining turbo units, as well as a double-circuit 500kV transmission line. Preliminary project activities for phase one primarily include the relocation of 62km of the Karakorum Highway to a higher elevation, 81km of right bank access roads, a 45km-long, 132kV transmission line from the Duber Khwar hydropower plant to Dasu, land acquisition, construction of accommodation facilities, and development of resettlement sites. Other ancillary activities involve the construction of access roads, bridge, tunnels, and offices. Land acquisition and phase one construction works are currently underway. WAPDA plans to acquire a total of 9,970 acres of land, out of which 2,029 acres is planned for main civil works construction. More than 741 acres were acquired as of October 2018. Construction of right bank access roads, relocation of Karakoram Highway (KKH), construction of transmission line and grid station, and diversion tunnel inlets was underway as of the fourth quarter of 2018. ________________________________________ If you found this video helpful, leave us a comment and don't forget to give us a thumbs up! 👍 ________________________________________ INSTAGRAM: @HydropowerPK   / hydropowerpk   FACEBOOK:   / hydropowerpk   YOUTUBE:    / cheapenergy   TWITTER:   / cheapenergy3   FACEBOOK GROUP:   / 474156706292162  

Comments